Published on Australian Maritime Safety Authority (https://www.amsa.gov.au)
Sections below are broken up into the activities as shown in the MARS application.
Download an example of a certificate of survey initial checklist (DOCX 28 KB) DOCX27.84 KB
If completing in MARS, please ensure all fields listed in the plan approval activity have data in them.
Ensure you have supplied or uploaded the appropriate plans for the plan approval activity.
Ensure you have supplied or uploaded approval letters, noting plan approval letter(s) must specify:
If the vessel is foam, a plan of the vessels flotation quantity, type and distribution should be provided.
For initial hull structure, engineering, fire and fit out, electrical, fuel tank, initial load line, watertight and weathertight and shaft surveys.
Ensure the correct survey reports have been supplied or uploaded to the activity.
Ensure one of the following:
When entering in MARS ensure the vessels lightship details have been entered into the lightship section of the activity.
When entering in MARS enter the date of the check + displacement. LCG and VCG can be left blank.
If foamed, then if swamp tested, provide report and attach to stability. If calculation based on vessel displacement is used, ensure a vessel weight report is supplied or attached to the lightship activity.
Ensure the correct stability documentation has been supplied or uploaded to the stability assessment activities:
If completing in MARS, ensure the vessels stability criteria and approval date have been entered into the "Stability" section of the activity.
Ensure the criteria applied is acceptable for the classes applied for.
If completing in MARS, ensure the load line assignment activity has all fields completed.
Ensure the approved load line assignment calculations have been supplied or uploaded.
Ensure all the fields in the commissioning activity have been completed.
Ensure you have supplied or uploaded:
An application recommended with condition is required to have a justification. Have you provided the reasons why you have recommended a proposed condition(s)?
If adequate justification has not been provided the delegate may not be able to progress the application.
If you have marked a survey as not required, include documented reasons why the survey is either not applicable to the kind of vessel, or not applicable in the particular circumstance.
If adequate justification has not been provided the delegate may not be able to progress the application.