Use this checklist to prepare for the inspection. Below is a sample of the focused inspection campaign checklist.
No. |
Question |
Yes |
No |
NA |
1 |
Have survival craft falls been inspected periodically, with special regard to areas passing through sheaves? |
|
|
|
2 |
Have the procedures for permits to work been used onboard? |
|
|
|
3 |
Have the IMO Guidelines for fixed carbo dioxide fire-extinguishing systems been incorporated in the maintenance plan?? |
|
|
|
4 |
Have the air pipes to ballast and other tanks been maintained after survey? |
|
|
|
5 |
Have maintenance inspections been held at intervals in accordance with the SMS? |
|
|
|
6 |
Has the Sewage Treatment Plant been maintained to conform to the provisions of MARPOL Annex IV? |
|
|
|
7 |
Have essential software, such as engine and generator control system software, been maintained in accordance with manufacturer’s instructions? |
|
|
|
8 |
Has the inventory and inspection of cargo securing equipment been conducted by the ship's crew? |
|
|
|
9 |
Has the ship been maintained after survey? |
|
|
|
|
POST INSPECTION |
|
|
|
|
Have deficiencies been issued as part of the FIC? |
|
|
|
|
Has the ship been detained as part of this FIC? |
|
|
|
|
|
|
|